The Pond
Home Retour - Back - Ritorno Le Blanc-Argent - Page française The Blanc-Argent - English Home Page Il Blanc-Argent - Pagina italiana

 

The Building Steps Modules Infrastructure Tools and Methods The Pond The Station Module The railway-crossing keeper’s house The Rolling Stock

Ecrivez-moi/Write to me/Scrivetemi :

Liens/Links


Click an image to get more details

The construction of the lake begins with its typical floodgate.

Plaster is poured on the lake surface.

Waves are simulated on the surface with a sponge.

Then Let the plaster dry.

Then a layer of dark green acrylic paint followed by several layers of matt medium.

View of the floodgate reflected in the lake’s surface.