Detail view of the Pond's construction
Home Retour - Back - Ritorno Le Blanc-Argent - Page française The Blanc-Argent - English Home Page Il Blanc-Argent - Pagina italiana

 

Framework The Framework of Module 2 Detail view of the Pond's construction Foam Board Base Assembled Modules Wrap-up the two Modules Unscrewing the Cover The Track is laid Track switches (1) Track switches (2) Track switches (3) Track switches (4) Track switches (5) Installation of the Gaugemaster controller (1) Installation of the Gaugemaster controller (2) Installation of the Gaugemaster controller (3) Installation of the Gaugemaster controller (4)

Ecrivez-moi/Write to me/Scrivetemi :

Liens/Links


© 2003  J.P. Joliveau

La zone de l’étang en gros plan.

On distingue bien les découpes dans les tasseaux du cadre et la plaque de contreplaqué.